Company Profile

Mazagon Dock Shipbuilders is India's premier state-owned naval shipbuilder, with a near-monopoly position in constructing destroyers and submarines for the Indian Navy. The company benefits from a substantial multi-year order book backed by the government's defense indigenization push. Our order-book driven revenue model and execution margin analysis are benchmarked against P/E multiples of comparable defense PSUs.

The Business

Mazagon Dock Shipbuilders is India's leading defence public sector shipyard, under the Ministry of Defence. Its dockyard dates back to 1774, the company was incorporated in 1934 and acquired by the Government of India in 1960. In June 2024 it was given Navratna status, the first government owned shipyard to receive it. It is the only Indian shipyard to have built both destroyers and conventional submarines for the Indian Navy.[1]

The yard sits at Dockyard Road, Mazagon, in Mumbai, with additional facilities at Nhava. The two sites hold dry docks, wet basins, fabrication shops, submarine assembly lines and shore integration facilities, and the infrastructure is in place to build 11 submarines and 10 warships at the same time.[1]

The company states it has delivered 809 vessels since 1960, including 34 warships and eight submarines. It listed on the BSE and the NSE in 2020, trading as BSE 543237 and NSE MAZDOCK, and employed 6,327 people in 2024. The share closed at Rs 1,839 on 5 November 2026, with a market capitalisation of about Rs 73,819 crore.[8]

What it builds is warships, submarines and specialised vessels for the Indian Navy and the Coast Guard. Its key products are the Project 15B destroyers, the Project 17A stealth frigates and the Project 75 Kalvari class submarines, along with submarine refits, offshore platforms, air independent propulsion systems and commercial vessels. Revenue in FY25 split as ship construction 64.40 percent, offshore projects 22.70 percent, sales of base and depot spares 12.50 percent and others 0.20 percent.[1]

Its customers are mainly the Indian Navy and the Coast Guard, sovereign buyers, so collection risk is low, and revenue follows milestone billing as work is executed and certified.[1]

Ships Built and Under Construction

Project 15B, Visakhapatnam class destroyers

Four ships, all in service: INS Visakhapatnam, INS Mormugao, INS Imphal and INS Surat. Visakhapatnam was commissioned on 21 November 2021, Mormugao on 18 December 2022, Imphal on 26 December 2023, and Surat, the fourth and last of the class, on 15 January 2025.

In service

Project 15A, Kolkata class destroyers

Three ships, all in service: INS Kolkata, commissioned in August 2014, INS Kochi in September 2015 and INS Chennai in November 2016.

In service

Project 15, Delhi class destroyers

Three ships, all in service: INS Delhi, commissioned on 15 November 1997, INS Mysore on 2 June 1999 and INS Mumbai on 22 January 2001.

In service

Project 17A, Nilgiri class stealth frigates

Seven ships. MDL built four, Nilgiri, Udaygiri, Taragiri and Mahendragiri, and Garden Reach built three, Himgiri, Dunagiri and Vindhyagiri. Nilgiri was delivered on 20 December 2024 and commissioned on 15 January 2025. Udaygiri was delivered on 1 July 2025 and commissioned on 26 August 2025. Himgiri was commissioned on 26 August 2025 and Dunagiri in June 2026. Taragiri was delivered on 28 November 2025 and commissioned on 3 April 2026. Mahendragiri, the last of MDL's four, was delivered on 30 April 2026 and commissioned on 11 July 2026. Vindhyagiri was launched on 17 August 2023 and its delivery date has not been announced.

Building

Project 17, Shivalik class frigates

Three ships, all in service: INS Shivalik, commissioned in April 2010, INS Satpura in August 2011 and INS Sahyadri in July 2012.

In service

Project 75, Kalvari class submarines

Six boats, all in service: INS Kalvari, INS Khanderi, INS Karanj, INS Vela, INS Vagir and INS Vagsheer. Vagsheer, the sixth and last, was commissioned on 15 January 2025, the same day as Surat and Nilgiri. From the fourth boat, INS Vela, onwards, the batteries are bought from Exide Industries in India instead of being imported, which has saved about Rs 18.80 crore in foreign exchange.

In service

Shishumar class submarines

The first submarine class built in India. Two boats were built by MDL under licence from Howaldtswerke-Deutsche Werft of Germany: INS Shalki, commissioned on 7 February 1992, and INS Shankul on 28 May 1994.

In service

Project 75I

Six next generation submarines to be built with Germany's ThyssenKrupp Marine Systems, a programme valued at about Rs 70,000 to 90,000 crore, with estimates differing. Commercial negotiations began in January 2025, and on 1 October 2026 the Defence Secretary said the programme was at its final stage and had been submitted for a decision by the competent authority. Once signed it still needs Cabinet Committee on Security approval, and the first boat has been projected at around seven years from signing.

Planned

Additional Scorpene submarines

Two to three more Kalvari class submarines, valued at Rs 30,000 to 40,000 crore. The Defence Secretary spoke of two additional boats on 1 October 2026, while other reporting has put the number at three. The proposal is under consideration and is not as far along as Project 75I. At the Euronaval exhibition in Paris in November 2026, MDL and France's Naval Group discussed a possible additional submarine project, but no agreement, value or schedule was announced.

Planned

Commercial and offshore vessels

Six hybrid multi purpose vessels for Navi Merchants of Denmark, a contract signed in September 2024 for six firm vessels of 7,500 deadweight tonnes with an option for four more, at about Rs 700 crore. Production of the first vessel began in September 2024 and the keel of the second was laid in November 2025. MDL has also won a 39 million dollar contract from the Shipping Corporation of India for the country's first methanol dual fuel diesel electric platform supply vessel, plus offshore work for ONGC.

Building

Coast Guard and other vessels

Six next generation offshore patrol vessels for the Indian Coast Guard under a contract signed on 20 December 2023. The ships displace about 2,700 tonnes, measure 117 metres and reach 23 knots, and the keel of the first vessel was laid on 22 July 2025. MDL built the first two Khukri class corvettes for the Navy, commissioned in 1989 and 1990, and has delivered nine of an order of fourteen floating border outposts for the Border Security Force.

Building

Ship status as of November 2026. In total, the company states it has delivered 809 vessels since 1960, including 34 warships and eight submarines.[6][7][14]

Order Book and Growth

The order book has fallen from Rs 32,260 crore in March 2025 to Rs 16,443 crore in September 2026 as ships were delivered and no large new contract was signed. That is the central fact of the story today. The yard is running down its backlog while the big submarine orders wait for approval. The book is now about 1.3 times FY26 revenue, so the company needs new orders to keep growing.[1][2][8]

Order bookRs crore
March 202532,260
September 202527,415
December 202523,758
March 202620,535
June 202618,218
September 202616,443

What is in the book

The balance order book of Rs 20,535 crore as of March 2026 is led by the Project 17A stealth frigates at Rs 8,257 crore, followed by ONGC offshore projects at Rs 3,320 crore, Coast Guard programmes at Rs 2,690 crore, Project 75 Kalvari submarines at Rs 1,722 crore, air independent propulsion systems at Rs 1,687 crore, medium refit and life certification at Rs 754 crore, the Denmark hybrid vessels at Rs 717 crore and a Shipping Corporation of India platform supply vessel at Rs 365 crore.[1]

What is in the pipeline

The pipeline is where the next decade of the company sits. Project 75I is valued at about Rs 70,000 to 90,000 crore, with estimates differing, the two to three additional Scorpene submarines at about Rs 33,000 crore, and next generation frigates and destroyers at about Rs 1,50,000 crore, taking the total order funnel to about Rs 2.5 lakh crore, down from about Rs 2.9 lakh crore estimated in August 2026. Beyond submarines, the pipeline holds the Project 17B frigate request for proposal worth about Rs 70,000 crore, 17 Bravo ships worth Rs 50,000 to 60,000 crore, a Rs 40,000 crore Landing Platform Dock bid through a memorandum of understanding with Swan Shipyard, and mine countermeasure vessels worth Rs 40,000 crore. The company has set itself an order inflow target of Rs 1 lakh crore for FY27 if the submarine contracts are signed. On 1 October 2026 the Defence Secretary said Project 75I was at its final stage and had been submitted for a decision by the competent authority, and the first boat has been projected at around seven years from signing. Project 75I and the additional Scorpene await Cabinet Committee on Security approval.[1][4][9][10]

The policy backdrop

The Union Budget for 2026-27 raised the defence allocation to a record Rs 7.85 lakh crore, up about 15 percent, with the capital head at Rs 2.19 lakh crore, up about 24 percent. Of this, Rs 1.85 lakh crore is for capital acquisition, and about 75 percent of the acquisition budget is reserved for domestic industry. After Operation Sindoor, the ministry concluded approvals of over Rs 3.50 lakh crore and contracts worth Rs 2.10 lakh crore in FY26. The broader sector pipeline is estimated at Rs 2.3 trillion. India holds about 0.3 percent of the global orderbook by compensated gross tonnage as of 2024 and targets 4.5 million GT of annual capacity and a top 10 global position by 2030. The global shipbuilding market is estimated at about US$215 billion in 2025, growing to about US$262 billion by 2029.[1]

Latest Quarter, Q2 FY27

The quarter ended 30 September 2026, with results on 27 October 2026, was weak. Revenue was Rs 2,446 crore, down 16.5 percent from Rs 2,929 crore a year ago. Net profit was Rs 344 crore, down 54 percent from Rs 749 crore. Operating EBITDA, excluding other income, was Rs 199 crore, down about 71 percent, with the margin at 8.1 percent against 23.7 percent a year ago. Provisions of about Rs 446 crore weighed on the quarter. For the first half of FY27, revenue was Rs 5,389 crore and net profit Rs 897 crore. The company declared an interim dividend of Rs 5 per share, with 3 November 2026 as the record date.[2][3]

Two things to read carefully. The investor presentation reports a higher EBITDA of Rs 450 crore for the quarter, with a margin of 18.4 percent, because that figure includes other income, so do not mix it with the operating EBITDA of Rs 199 crore used here. And no public transcript of the Q2 FY27 earnings call could be found, so the management points on this page come from the investor presentation, the board filing and broker notes instead.[22]

Q2 FY27Q2 FY26Change
RevenueRs 2,446 crRs 2,929 cr-16.5%
EBITDARs 199 crRs 695 cr-71%
EBITDA margin8.1%23.7%-1,560 bps
Net profitRs 344 crRs 749 cr-54%

The reason is straightforward. The order book is depleting and large programmes have ended, so execution slowed and fixed costs ate into margins. The share fell as much as 10 percent on 27 October to an intraday low of Rs 1,691, and fell 13 percent over two sessions to a 52 week low of Rs 1,688.35 on 28 October, taking market capitalisation below Rs 70,000 crore. Brokerages cut estimates and targets after the results, Kotak Neo to Sell with a target of Rs 1,660, HSBC to Reduce at Rs 1,680 and JP Morgan to Sell at Rs 1,490, while Antique kept a Buy at Rs 2,725, down from Rs 3,276, and Choice kept a Buy at Rs 2,500, down from Rs 3,100. The honest read is that near term earnings stay weak until the submarine orders are signed, with revenue expected to pick up from FY29 as new orders start contributing.[2][3][4]

Financials

The company posted revenue from operations of Rs 11,432 crore in FY25, up 20.8 percent from Rs 9,467 crore in FY24, driven by steady execution of the Project 17A stealth frigates and the P75 Kalvari class submarines.[1]

For the year ended 31 March 2026, consolidated revenue from operations was Rs 13,006 crore, up 13.8 percent from FY25, with operating EBITDA of about Rs 2,267 crore at a margin of 17.4 percent and consolidated net profit of Rs 2,578 crore, up 6.8 percent, a net profit margin of 19.8 percent. On a standalone basis, revenue was Rs 12,840 crore and net profit Rs 2,436 crore. In Q1 FY27, the quarter ended 30 June 2026, consolidated revenue was Rs 2,943 crore and net profit Rs 550 crore.[8]

FY21FY22FY23FY24FY25FY26
Revenue growth-18.7%41.6%36.5%20.9%20.8%13.8%
EBITDA margin5.5%7.6%10.2%14.9%18.0%17.4%
PAT margin11.8%10.2%13.7%19.5%20.3%19.8%

FY26 figures are consolidated audited results; the FY26 EBITDA margin is operating EBITDA, excluding other income.[8]

Gross margin expanded from 28.3 percent in FY24 to 35.9 percent in FY25 as revenue grew 20.8 percent while the cost of materials consumed actually declined. Raw material was 53.7 percent of revenue in FY24, falling to 39.6 percent in FY25. Import content in capital warships is down to 20 to 25 percent, and indigenisation of the Kalvari submarines has reached about 75 percent.[1]

Selling, general and administrative expense was Rs 1,101 crore in FY24, 11.6 percent of revenue, and Rs 1,303 crore in FY25, 11.4 percent of revenue. Employee costs have fallen from about 15 percent of revenue toward 9.5 percent, even as the wage bill rises in absolute terms with hiring for upcoming programmes. Inventory stood at Rs 5,713 crore in FY24 and fell to Rs 4,537 crore in FY25, with inventory days falling from 307 to 226 as submarines and destroyers were delivered. Receivables fell from Rs 1,847 crore to Rs 1,067 crore, 71 days to 34 days, as milestone payments came in. Payables fell from Rs 4,466 crore to Rs 3,738 crore, 240 days to 186 days of cost of goods sold.[1]

The standalone company has no debt. Zero borrowings, no term loans, no working capital facilities, no bonds. Finance cost runs Rs 4 to 6 crore a year. Working capital is funded through Navy advances rather than lenders. The consolidated accounts carry about Rs 447 crore of borrowings of the Colombo Dockyard subsidiary. Consolidated net worth strengthened to Rs 9,755 crore in March 2026, with cash of Rs 13,101 crore, while standalone net worth was Rs 8,843 crore.[1][8]

Street estimates in the report put FY27E revenue at Rs 14,827 crore and FY28E at Rs 17,106 crore. After the Q2 FY27 miss, brokerages expect soft revenue growth until FY28, picking up in FY29, at about a 9 percent revenue CAGR over FY26 to FY29E.[1][4]

Capex and Expansion

The company is executing a capex programme of about Rs 6,400 crore anchored by a 40 acre greenfield yard at Nhava, which will double yard capacity over three to four years. Capex in the model rises from Rs 500 crore in FY26 to Rs 2,043 crore by FY30, running at about 10 percent of revenue from FY27. This expansion is funded from internal accruals by a debt free company.[1]

At Nhava itself, MDL is investing more than Rs 1,000 crore, including a Rs 475 crore contract to Shoft Shipyard in Gujarat to build a floating dry dock in six blocks for erection at Nhava, four of the six blocks complete at the last update. The dock will measure 180 metres by 44 metres by 19.5 metres and will be able to handle eight 12,800 tonne class ships at the same time. In Mumbai itself, MDL will reclaim 10 acres to create two new basins, doubling the yard's deadweight handling capacity from 40,000 tonnes to 80,000 tonnes, and with a further 37 acres acquired at Nhava Sheva port it aims to reach 2 lakh tonnes. A second graving dry dock of about 180 metres by 60 metres is also planned, and a shipbuilding and ship repair facility on 15 acres leased from the Mumbai Port Authority for 29 years began operations in July 2025. Management plans capital expenditure of Rs 2,500 to 3,000 crore over three to four years.[8]

Beyond Nhava, MDL has signed memorandums of understanding for greenfield shipbuilding clusters at Dighi in Maharashtra and Dugarajapatnam in Andhra Pradesh. Dugarajapatnam, signed on 18 September 2026, is expected to see about Rs 15,000 crore invested over five to seven years, for a yard designed for 1.2 million gross tonnes a year building commercial vessels including tankers, bulk carriers, container ships and LNG carriers, and is expected to generate direct and indirect employment for about 45,000 people. Dighi, signed on 15 September 2026, is bigger: the Maharashtra government said MDL would invest about Rs 27,000 crore and the project would generate about 90,000 jobs, with a target of at least 2 million gross tonnes of annual shipbuilding capacity, and on 3 November 2026 the state fisheries and ports minister said a tripartite agreement had been finalised for the same project, with an investment of Rs 26,500 crore and about 50,000 jobs. The two announcements differ on the investment and jobs figures, so both are recorded here as stated. The earlier Tuticorin memorandum of September 2025, a Rs 15,000 crore commercial yard with phase 1 of Rs 5,000 crore able to build ships up to 300,000 tons, will not go ahead: MDL has decided not to proceed after Tamil Nadu awarded its anchor slot to Korea's HD Hyundai, and is focusing instead on Dighi and Dugarajapatnam. The new yards target a 15 to 17 percent return over 5 to 7 years.[1][11][12][13]

MDL has acquired a 51 percent stake in Colombo Dockyard in Sri Lanka, completed in April 2026 for about Rs 249.5 crore, after the board had cleared an investment of up to 52.96 million dollars, about Rs 452 crore, in June 2025. Colombo Dockyard is Sri Lanka's largest shipyard, with four graving dry docks and a maximum vessel capacity of 125,000 deadweight tonnes, and the board has been reconstituted with MDL members. On 27 October 2026 the board approved additional credit facilities of Rs 1,250 crore from State Bank of India for a back to back standby letter of credit in favour of State Bank of India, Sri Lanka, so Colombo Dockyard can give bank guarantees for shipbuilding advances, and MDL is liable if the subsidiary defaults. On exports, it is executing the Denmark order for six hybrid multi purpose vessels at about Rs 700 crore and is bidding for defence projects worth over Rs 3 lakh crore. The Sagarmala programme and the Shipbuilding Financial Assistance Policy of Rs 4,000 crore support the commercial leg.[1][8]

On repair and refit, the order book already includes Rs 754 crore of medium refit and life certification work. In September 2023 MDL became the second Indian shipyard, after Larsen and Toubro's Kattupalli yard, to sign a Master Ship Repair Agreement with the United States Government for repair of Military Sealift Command fleet support ships, but today it lacks the infrastructure for large ships, which is exactly the gap the Nhava expansion and the new greenfield yards are meant to close. On technology, MDL is building air independent propulsion capability for submarines, with Rs 1,687 crore of AIP systems already in the order book. This is the technology that lets conventional submarines stay submerged longer.[1]

Valuation

The valuation uses a weighted average cost of capital of 11.88 percent, built from a risk free rate of 5.08 percent, an equity risk premium of 6.15 percent, an asset beta of 0.63 and a small size premium of 3.10 percent. On perpetuity growth of 4 percent, the discounted cash flow gives an equity value of Rs 34,174 crore, or Rs 847 per share. On an exit multiple of 6.0 times, it gives Rs 862 per share. The market price at the time of the report was Rs 2,213.[1]

Valuation methodValue per shareDifference
DCF, perpetuity growthRs 847-61.7%
DCF, exit multipleRs 862-61.0%
Relative, EV/SalesRs 2,163-2.2%
Relative, EV/EBITDARs 2,358+6.6%
Relative, P/ERs 2,747+24.2%

Relative valuation applies peer multiples to MDL: EV/Sales of 5.5 times gives Rs 2,163 per share, EV/EBITDA of 34.8 times gives Rs 2,358 and the peer median P/E of 42.9 times gives Rs 2,747.[1]

The gap between the DCF and the market price is the whole story of this valuation. The market is pricing in order book conversion and unsigned opportunities such as Project 75I that sit outside the explicit forecast, while the DCF only counts what is visible and forecastable. These DCF figures remain provisional pending the provisions review, and the Rs 446 crore of provisions in Q2 FY27 shows why that caveat matters. This report was prepared for education and is not investment advice.

Valuation as per the report prepared in September 2026. The market price was Rs 2,213 at that time. The live price on the companies page shows where the stock trades today.

Shareholding and Management

Shareholding, September 2026Holding
Promoter, Government of India81.22%
Foreign institutional investors1.73%
Domestic institutional investors5.09%
Public11.96%

Total shares 40,33,80,000. Domestic institutions split as mutual funds 1.47 percent and insurance companies 3.57 percent, with the Life Insurance Corporation of India the largest institutional holder at 3.31 percent. Individuals holding up to Rs 1 lakh account for 10.19 percent. No promoter shares are pledged. The promoter holding was 84.83 percent until the June 2025 quarter, when it fell to 81.22 percent after the government sold a stake through an offer for sale. Shareholding pattern filed with BSE on 16 October 2026.[5]

The secretarial audit has again flagged non compliance on board independence, because the Defence Ministry has not appointed enough independent directors.[21][8]

Dividends

The face value of the share is Rs 5, after a one for two split in December 2024 from a face value of Rs 10, so dividend figures before the split are not directly comparable with figures after it. The company has paid a dividend in each of the last six financial years up to FY26.[15]

DividendPer shareDeclaredRecord date
FY26 first interimRs 6.0027 Oct 20254 Nov 2025
FY26 second interimRs 7.505 Feb 202613 Feb 2026
FY26 finalRs 4.6230 Apr 202620 Aug 2026
FY27 interimRs 5.0027 Oct 20263 Nov 2026

FY26 dividends totalled Rs 18.12 per share. For FY25 the dividends were an interim of Rs 23.19 per share on the old face value of Rs 10, a second interim of Rs 3.00 and a final of Rs 2.71 per share. The FY27 interim of Rs 5.00 per share is payable on or before 26 November 2026. At the 5 November 2026 close of Rs 1,839, the FY26 total of Rs 18.12 is a dividend yield of about 1.0 percent.[15]

Key Risks

Order book depletion and timing

The book has halved in 18 months, and new orders depend on Project 75I and the additional Scorpene being signed. Delays push revenue into FY29 and beyond.[1][4]

Customer concentration

Almost all revenue comes from the Indian Navy and the Coast Guard, a single customer in effect.[1]

Execution and provisions

Shipbuilding runs on long cycles with high fixed costs, so margins fall sharply when execution slows, as the 8.1 percent EBITDA margin in Q2 FY27 showed, and provisions of about Rs 446 crore hit the same quarter.[2][3]

Foreign dependence

Specialised systems still come from foreign equipment makers, which brings supply chain risk.[1]

Competition and pricing

Global competition and pricing pressure in commercial shipbuilding, and a long execution cycle from order to delivery.[1]

Working capital

Large defence projects tie up working capital, and the company reported an operating cash outflow of Rs 1,948 crore in the first half of FY27, against an outflow of Rs 3,288 crore in the first half of last year. Contract liabilities, which are advances from customers, fell by about Rs 3,450 crore in the same period, to Rs 6,853 crore.[8]

Colombo Dockyard

The subsidiary has a history of losses, including a loss of 38.3 million dollars in 2023, and MDL has now extended Rs 1,250 crore of credit support to it and is liable if it defaults.[8]

Margin normalisation and governance

High margin legacy projects are completing, and management guides a normalised profit before tax margin of about 15 percent over the medium term, below the margins of recent years, with broker summaries expecting EBITDA margins to compress from about 26 percent towards 16 percent as the mix changes. Large provisions have hit margins in three of the last four quarters. The secretarial audit has also flagged non compliance on board independence.[8]

Key Competitors

Cochin Shipyard

The largest shipbuilding and ship repair facility in India, under the Ministry of Ports, Shipping and Waterways. It built the aircraft carrier INS Vikrant and works across defence vessels, commercial ships such as tankers, bulk carriers and offshore vessels, and major ship repair and life extension. It is the most diversified of the three, with a strong export presence and a balance between defence and commercial work. For FY26, consolidated revenue was Rs 5,022 crore, up 4.2 percent, with net profit of Rs 717 crore, down 13.3 percent, and an operating EBITDA margin of 16.2 percent. Its main work in hand is eight Mahe class anti submarine warfare shallow water craft for the Navy and six next generation missile vessels ordered in March 2024 for Rs 9,805 crore, with deliveries from March 2027. The first Mahe class ship, INS Mahe, was delivered on 23 October 2025 and commissioned on 24 November 2025, and the second, INS Malvan, was commissioned in July 2026. The order book was about Rs 22,000 crore in September 2026, and would rise to about Rs 27,000 crore if the survey vessel order is secured. Q2 FY27 results are due on 10 November 2026.[1][17]

Garden Reach Shipbuilders and Engineers (GRSE)

The Kolkata based defence shipyard under the Ministry of Defence. It designs and builds frigates, corvettes, anti submarine warfare vessels, survey vessels, patrol vessels and landing craft for the Navy and the Coast Guard, and was the first Indian shipyard to export a warship. It also makes deck machinery, marine diesel engines, portable bridges and naval guns, with a high indigenous content focus. For FY26, revenue was Rs 7,002 crore, up 38.0 percent, with net profit of Rs 748 crore, up 41.8 percent, and an operating EBITDA margin of 11.4 percent, and it delivered eight warships to the Navy in the year. On 2 November 2026 the Ministry of Defence signed contracts worth Rs 53,866.50 crore for eight next generation corvettes, of which Garden Reach will build five for about Rs 32,000 crore and Goa Shipyard will build three, with deliveries from 2031 and the first launch aimed at late 2029. The order is more than 4.5 times the company's FY26 revenue. Its export order for multi purpose vessels for a German client has been expanded to twelve ships. Q2 FY27 results are due on 11 November 2026.[1][18][16]

Hindustan Shipyard

The Visakhapatnam based shipyard building and repairing vessels for the Navy and the Coast Guard, including submarine refits. Its largest programme is five fleet support ships for the Indian Navy, each of 43,500 tonnes, for replenishing warships at sea. The first ship was launched on 6 October 2026 by the Defence Minister, the keel of the fifth ship was laid the same day, and a new slipway and a 300 tonne crane were opened at the yard. The yard also builds diving support vessels for the Navy, and INS Nipun, the second of that class, joined the fleet on 30 August 2026. For FY26, the yard reported its highest ever value of production at Rs 1,969 crore, up 34 percent, with profit before tax of Rs 479.47 crore, and the order book was Rs 18,295 crore, of which 99.72 percent was from the Indian Navy. It is not listed, so it has no share price and no market capitalisation.[19][20]

How they compare

FY21 to FY25 averageMazagon DockCochin ShipyardGRSE
Revenue growth20.2%11.5%32.2%
EBITDA margin11.2%21.9%7.0%
PAT margin15.1%18.0%10.7%
FY25Mazagon DockCochin ShipyardGRSE
Revenue growth20.8%25.8%41.3%
EBITDA margin18.0%21.3%8.3%
PAT margin20.3%17.2%10.4%

FY26, the last completed year

FY26Mazagon DockCochin ShipyardGRSE
RevenueRs 13,006 crRs 5,022 crRs 7,002 cr
Revenue growth13.8%4.2%38.0%
Operating EBITDA margin17.4%16.2%11.4%
Net profit margin19.8%14.3%10.7%
Order bookRs 16,443 crRs 22,000 crRs 47,324 cr
Market capRs 73,819 crRs 30,577 crRs 23,448 cr

Order books as of September to November 2026; market capitalisations as of 5 November 2026, with MDL's as of 2 November 2026.[8][17][18]

Measured against FY26 revenue, the order book covers about 6.8 years at Garden Reach, about 4.4 years at Cochin Shipyard, about 9 years at Hindustan Shipyard on production value, and about 1.3 years at Mazagon Dock. MDL has the shortest visibility of the four and the most riding on new awards, even though the market values it at about 2.4 times Cochin Shipyard and about 3.1 times Garden Reach, because it is the only yard that builds submarines and destroyers and its pipeline includes the two largest submarine programmes in the country. Only MDL had reported Q2 FY27 by 5 November 2026, so the September quarters cannot be compared yet.[8][17][18]

No company is a perfect comparable to Mazagon Dock, since it remains the only Indian shipyard to have built both destroyers and conventional submarines. The comparison uses the defence shipbuilding and engineering companies with the closest business models, and companies with extreme values were left out of the considered set.[1]

Sources

  1. 1. Mazagon Dock Shipbuilders, Annual Report 2024-25 and valuation report, prepared September 2026. Figures for the business, financials, order book, capex and valuation are taken from this report.
  2. 2. Business Today, Mazagon Dock shares crash 13% after Q2 results, 28 October 2026. businesstoday.in
  3. 3. NDTV Profit, Mazagon Dock Q2 Review: Kotak Neo, HSBC Cut Target Prices, 28 October 2026. ndtvprofit.com
  4. 4. HDFC Securities, Results Daily, 28 October 2026. c.ndtvimg.com
  5. 5. Shareholding pattern for the quarter ended 30 September 2026, filed with BSE on 16 October 2026. thecompanycheck.com
  6. 6. The Economic Times, warship deliveries and commissionings, 2025 to 2026. economictimes.indiatimes.com
  7. 7. WION, Indian Navy inductions in 2025. wionews.com
  8. 8. ICICI Direct Research, Mazagon Dock Shipbuilders Q4 and FY26 Result Update, 5 May 2026. ICICI Direct Research, PDF
  9. 9. The Financial Express, MDL's order book could surge 14x to Rs 2.9 lakh crore, 16 August 2026. financialexpress.com
  10. 10. India Defence Wire, P75I submarine deal at final stage: Defence Secy, 2 October 2026. indiadefencewire.com
  11. 11. Moneycontrol, Mazagon Dock to invest Rs 15,000 crore in Andhra's Dugarajapatnam shipyard, 18 September 2026. moneycontrol.com
  12. 12. The Daily Pioneer, India's largest shipyard to come up in Raigad; MDL to invest Rs 27,000 crore, 15 September 2026. dailypioneer.com
  13. 13. Deccan Chronicle, Dighi Port To Get India's Largest Shipyard, 3 November 2026. deccanchronicle.com
  14. 14. Press Information Bureau, Indian Navy commissions INS Mahendragiri, 11 July 2026. pib.gov.in
  15. 15. Dhan, Mazagon Dock Shipbuilders Dividend, 5 November 2026. dhan.co
  16. 16. Naval News, Indian Navy Places Orders for Eight Next Generation Corvettes, 3 November 2026. navalnews.com
  17. 17. ICICI Direct Research, Cochin Shipyard Company Update, 11 September 2026. icicidirect.com
  18. 18. ICICI Direct Research, Garden Reach Shipbuilders and Engineers Q4 and FY26 Result Update, 13 May 2026. icicidirect.com
  19. 19. WION, Defence Minister Rajnath Singh launches navy's first fleet support ship, 6 October 2026. wionews.com
  20. 20. CARE Ratings, Hindustan Shipyard Limited rating rationale, 9 March 2026. careratings.com
  21. 21. Mazagon Dock Shipbuilders Limited, Leadership, official website, accessed 5 November 2026. mazagondock.in
  22. 22. Multibagg, Mazagon Dock: Lower H1 Profit, Bigger Shipbuilding Ambitions, 27 October 2026. multibagg.ai

For education only, not investment advice. Figures are as reported by the sources above.